Big River Steel NGO Project

Oceola, AR
Non-Grain Oriented processing line Facility
Construction Engineering Services
Adding new lines to the existing facilities
2021–2023
After successful construction installation and operation of all Phase 1 and Phase 2 equipment, Big River Steel (BRS) is expanding the Cold Rolling Facility by adding the Non-Grain Oriented (NGO) processing lines facility.

Project Highlights:

Our Scope:

Our projects